Studio 071118
A full day at the studio. A full day means arriving at 11:00 and leaving at 15:50, I am retired after all.
First off I stretched the paper in the foreground, I’ll be interest to see how this dries given the lack of heating and fabulous ventilation. The time is an hour ahead on this photo, I couldn’t be arsed to change the time when the clocks went back. I moved on to constructing the panels for part one of the installation.
I cut all the wood first, twenty eight short lengths and then moved onto assembling the panels. I got the timing down to fifteen minutes a panel when my portable drill finally charged up. Before that I was putting the screws in by hand, each panel has eight 100mm bullets and fourteen 25mm bullets. The photographs illustrate the very simple production line approach.
An aside for today about the electricity. The supplier is e-on and their standard tariff is around 15.75 pence per KWh. The meter read 277 when I took possession and read 283 after today’s work. The advantage of having only one socket to power everything from.
The video is here so you can hear the noise the rain makes on the corrugated roof.
Friday 9th November. Arrive at 10:45 am with a view to completing as much of the structure as I can. Obviously someone has been in on Thursday as the lights come on when I enter the building. As it’s Axisweb’s rental I have to accept access by them and the landlord without prior notice. This could be either and maybe I won’t see the visitor I’m expecting today.
I made eight frames today to add to the six from Wednesday, each frame uses 4×2.4m C16 CLS 3×2 (48x75mm) at £3.10 each length and one sheet of whiteface hardboard at £7.75, so £20.16 per frame plus screws. Eight 100mm bullets costs about £1.70 and sixteen 25mm bullets are 23 pence. So £22.09 x 14 is £309.20 for the whole assembly. You could say £310.00 including the electricity.
I’ve got one spare frame to test the surfaces for the internal finish and I’m still toying with having a door. There are also a few spots that will need extra screws to lie flatter. You can also see how dark it is, 15:30 in November.
Here ends week one of the new studio!
Studio 091118
Like this:
Like Loading...