The Geranium Project (R&D) 27

Over Christmas I continued work on the VR element of the project. I’m working towards the AR animated birds for the installation and the photographic gardens using paper tied into knots.

bird knots drawing

bird knots drawing

This drawing is A1, charcoal, pencil and pastel and I’ve made a couple of 3d models and animated a short section.

bird knot models

bird knot models

I also tied a few pieces so that I can try out using them as an AR trigger.

I went into the studio for the first time on Friday 3rd January and met with wayne, details of this meeting follow.

Discussed current progress of work, what needs to happen next and what help wayne could give in achieving that.

Outlined the plan going forward.

  1. Tidy up current iteration of Geranium VR – skies, edges, tunnels, etc.,

  2. Introduce animated sections to painted garden

  3. Introduce animated birds to photo garden sections

  4. Finish spoken word sections, quotes and explicatory texts for tunnels, gnomic utterances for gardens

  5. make birdsong soundtracks for drawn and phot gardens

  6. Work with Iain Nicholls on build for VR space

  7. Work with Luke Roberts on AR birds for installation

  8. Finish rain section for installation, run PIR off tower PC if necessary

  9. Organise press release for Invitees week beginning 10th February 2020

  10. Invite appropriate people (get the invites out by end of next week 10/01/2020

  11. Get feedback from Kim & Luke for report etc.,

  12. Plan the next steps – meet with Mike Stubbs, Wayne, Luke & Kim to propose and develop next bid for funding

Wayne agreed to email me introductions to key people in Doncaster.

In discussing the next steps for the project wayne proposed several people it would be worth contacting in Doncaster Council, Doncaster Archives, Barnsley Museums etc.,

Two things particularly need establishing as part of the future display of the object, firstly the entrance to the space can be remade for each location it is placed in, and secondly that the photographic elements of the VR space provide potential for a number of future works utilising archival photgraphs and contemporaneous images. Hexthorpe Park springs to mind.

I need to put the press release information out onto my Linked In page, through Twitter, send to Doncopolitan for Facebook, onto the Doncaster Creative wotsit, onto a-n, Axisweb etc., as well as the blog and send it to Doncaster Free Press, Yorkshire Post, The Star (Sheffield?) and anywhere else I can think of.

The Geranium Project (R&D) 25

A week that promises to be fraught started with me getting to the shop early and installing the new white cloth projection screen for the installation. At firt it didn’t work too well but with the back material hanging behind it, it functions pretty well.

It did highlight the need to address the video, video with high contrast works much better. I then had to rush home.

Monday afternon I workled some more on the painted garden for the VR world. I also started to write up the text snatches to be recorded for the gardens and the installation.

Tuesday I continued to work on the painted garden, worked on the new videos and began to write this weeks blog so it doesn’t seem so thrown together. I got the open event advertised through Axisweb, but although I’d agreed an advert in doncopolitan (a local mag) I don’t think it has happened.

Wednesday was spent finishing off in the studio, sorting the hang and titling the paintings.

Thursday I made the labels and voted!

So Friday morning I rewired the sound system for the installation and set everything up for the open day.

On the day I had two visitors so in the afternoon I worked on putting some mist between the sections to make the transitions less stark.

On the Saturday I had no visitors at all, unless you count the man who was looking for the Junk Food Project who haven’t been at the address for two years or so. I worked on the VR section and got a lot done, finishing the mist, adjusting some scale and normal issues and introducing colour to the painted garden. I also made separate skies for the different sections and did some height adjustments to floors and so on.

 

The Geranium Project (R&D) 24

Another truncated week spent sorting out the space at the studio and organising the VR space at home.

The video shows how far I got on Wednesday with the installation, I’ve got until Thursday next to sort it out to a finished state.

I should be working on getting an exhibition together in a few days, instead of which I’m studying procrastination. Yesterday I spent time clearing the garden, today I cleaned off the yard and washed the car. I have at least four ictures to frame for the exhbition and hang next week, all the labelling to be done, and I still need to title the pieces. I’ve got two drawn gardens to put together and import to the VR that I need to be working and I’ve still got to work out the transitions between the gardens when I’m there. The projection needs to be resolved for the installation and I’ve should really change the video and work out the sound. Additionally I’ve not yet bottomed the PIR for the raining section of the installation. All this needs to be resolved in the next four days!

I’m rounding this post off with a few shots of the space as it stands today.

View of the Gallery

View of the Gallery

Progress of Drawings

Progress of Drawings

There are a combination of drawings and paintings which have informed the content of the installation and the VR world. The user should be able to recognise the paintings inside the VR space, how far that works remains to be seen.