The Geranium Project (R&D) 08

This week was supposed to be when I moved the VR into the space. Best laid plans and all that. I still need to sort out the internet for the studio and that’s delayed me for a week at the least. Life has intervened in other ways as well so part of the week was spent on the phone to Virgin Media.

I did get to the studio on Monday, continuing to work on the drawings I started last week,

Large Hydrangea August

Large Hydrangea August

adding some green to the big piece and working into the centre with black pastel and fingers.

One of six drawings made on Monday and Wednesday last week

One of six drawings made on Monday and Wednesday last week

As an example this is the development of the one I posted last week, another one looks like this now…

small hydrangea

small hydrangea

After this I got waylaid by virgin and decided to work on the VR at home for Wednesday and Thursday.

VR installation test

VR installation test

The first test I made works some of the drawings into a model of the installation space. The next two try to work the same drawings into the garden as a whole.

VR garden test

VR garden test

The latest has better materials but I’m still working out the problems with importing scale, establishing movement etc., should all be resolvable but I want to get it into the right ballpark before I bring the experts in.

2nd VR garden test

2nd VR garden test

this image and the next best illustrate the issue with scale

2nd VR garden test

2nd VR garden test

After 3 days away from the studio I continued to work on the large drawing, and did some further work on the small ones, but my major effort was to stretch some more paper on my new drawing boards.

large hydrangea

large hydrangea

small hydrangea

small hydrangea

And the studio looks like this.

Studio mid August

Studio mid August

The Geranium Project (R&D) 06

Monday was spent installing the curtain for Andrea’s installation and then positioning ‘Snow Line’ and hanging the companion drawing.

Monday Prep

Monday’s preparation

Andrea’s piece is a re-imagining of her recent MA exhibition about motherhood.

Andrea Berry - Installation

Andrea Berry – Installation

It has lighting and sound so this video gives a better impression.

On Tuesday we finished setting up the gallery downstairs when Luke and Kim brought their work from Barnsley. Adding a black curtain over the white for the downstairs installation and hanging seven of Kim’s large images. Luke placed his matrix of nine small prints at the foot of the stairs.

Composite Exhibition Image

Composite Exhibition Image

The evening really started for us at about 5:30 pm and we had a steady stream of visitors until I was able to lock up at 8:20 pm. Generally people were engaged and interested and we had up to fifteen people upstairs by 7:30 pm, so maybe between 80 and 100 visitors over the course of the night.

It makes it feel like the project is officially underway, even though that’s been the case for six weeks now.

The prosaic stuff. As this was part of the Doncaster Crawl, Doncopolitan contributed to the launch with posters and publicity as well as a good deal of coordination over the evening. The cost was limited to providing refreshments for our visitors so the evening cost me about £40.00 – It is useful to note that this cost is personal because no events were proposed in the project, it being R&D, but there will obviously be some costs associated with the planned review events in late September and December. Filling the holes from the last hang and painting added another £10.00 or thereabouts as I had white emulsion in and only needed to purchase filler. There is always a good amount of time spent prepping for a show and this used 22 hours of the 96 I’ve budgeted for physical assistance.  The shop makes a good venue and the exhibition will remain in place for a month or so.

The Geranium Project (R&D) 05

Work on the big drawing on Monday 15th

Monday 15th was a return to the studio after a weeks holiday. The nature of a break is that it causes something of a reassessment and provides only thinking time, there is no time to make anything. I thought a lot about ways to create the drawings in 3D, whether doing this made the VR space an exhibition, if I was spending too much time worrying about that and I should merely make the world simply?

I tried out an idea for the space as a maquette.

Monday macquettes

Monday maquettes

On Wednesday I had a visit from another artist who is going to show in the space with me on Tuesday next for the Doncaster Crawl. The first publicised event for the installation project. A good portion of the day was spent discussing options.  I started an ‘inspiration’ corner to give any visitors an idea of what I was intending.

Inspiration board

Inspiration board

One board with some of my thinking and quotes from sources that have informed it – I need to work on some visuals for this.

Questions and Lookups board

Questions and Lookups board

On the whiteboard I put suggestions made by the ‘mentors’ and some questions raised by them and myself.

Afterwards I produced an addition to the maquettes.

Maquettes

Wednesday macquettes

Maybe the video gives a better idea of my thinking?

 

Friday was a day of tidying and organising for the ‘Crawl’. I cleared the gallery space,

Gallery space ready for Monday

Andrea Berry is showing some of her MA work and I’ll show the three ‘Snow Line’ works across the centre. Hopefully there will be some others in the space as well.  I’ll use the upstairs to show the beginnings of ‘Geranium’.

Studio space for Monday

Sketchbooks on one table

Sketchbooks

and drawings on the other

Portfolio of Drawings

It will all be ready for 5pm on Tuesday.