The Geranium Project (R&D) 06

Monday was spent installing the curtain for Andrea’s installation and then positioning ‘Snow Line’ and hanging the companion drawing.

Monday Prep

Monday’s preparation

Andrea’s piece is a re-imagining of her recent MA exhibition about motherhood.

Andrea Berry - Installation

Andrea Berry – Installation

It has lighting and sound so this video gives a better impression.

On Tuesday we finished setting up the gallery downstairs when Luke and Kim brought their work from Barnsley. Adding a black curtain over the white for the downstairs installation and hanging seven of Kim’s large images. Luke placed his matrix of nine small prints at the foot of the stairs.

Composite Exhibition Image

Composite Exhibition Image

The evening really started for us at about 5:30 pm and we had a steady stream of visitors until I was able to lock up at 8:20 pm. Generally people were engaged and interested and we had up to fifteen people upstairs by 7:30 pm, so maybe between 80 and 100 visitors over the course of the night.

It makes it feel like the project is officially underway, even though that’s been the case for six weeks now.

The prosaic stuff. As this was part of the Doncaster Crawl, Doncopolitan contributed to the launch with posters and publicity as well as a good deal of coordination over the evening. The cost was limited to providing refreshments for our visitors so the evening cost me about £40.00 – It is useful to note that this cost is personal because no events were proposed in the project, it being R&D, but there will obviously be some costs associated with the planned review events in late September and December. Filling the holes from the last hang and painting added another £10.00 or thereabouts as I had white emulsion in and only needed to purchase filler. There is always a good amount of time spent prepping for a show and this used 22 hours of the 96 I’ve budgeted for physical assistance.  The shop makes a good venue and the exhibition will remain in place for a month or so.

The Geranium Project (R&D) 04

The week started with some work on the latest big drawing.

Big July Drawing

Still work to do, the greys need to go back a bit and the top right ‘v’ needs more definition, the balancing wedge on the left needs less definition. I think the bars in the bottom right need separating as well.

I did some work on some smaller drawings too, but not with any great sense of direction so they may well be used as collage very soon.

June/July Drawing

The big action this week though has been resolving the studio and investing in some kit. You are constantly weighing up future developments against current availability with VR kit. As I write HTC are a few months (or so) away from launching the Cosmos, which may or may not completely replace the Vive. There is no indication of cost yet. The alternatives are a Rift s, still a slight resolution issue according to reviews although that gap is narrowing and the Valve Index at £900.00

In the end, weighing everything up as far as I could, I went for the Vive and a PC powerful enough to run it.

After buying the kit I need I’ve then spent several hours installing before I can operate it properly. This has involved several hours reading forums and faqs about the issues I’ve faced as I installed and led me to thinking about the way the art can be dragged into being about the technology rather than the ideas. So time for a reality check and a list/timetable.

I’m aiming for a semi official launch at the Doncaster Crawl on the evening of July 23rd. After this, early August, I’m looking to bring the 3d modelled drawings into the virtual space and work on refining that aspect of the project. The first test run of a full public outing will be in September, preferably early, and then again in November/December after considering and reacting to the feedback at that event and from Iain, Wayne and Mike. Repeat this before an event in January/February to test the final(?) version and then prepare a report and spec the installation for proper display.

The big issue is turning the drawings into 3d and developing the (implied) narrative.

This blog covers two weeks as I’ve been away for a week.

The Geranium Project (R&D) 03

Studio View

Studio view 24th June 2019 – tidied for meetings.

This weeks starting question – Is the urge to tidy up when faced with a blank mind a symptom of age? Is having a blank mind a symptom of age? Probably worth acknowledging at this juncture that my idea of tidy may not have a very wide currency.

I visited the new studio today but it’s a building site. I was told that they were stripping out inessential fittings, like the intranet wiring and some shelving, and I should be able to move in. I’d need a hard hat and breathing apparatus to be able to move in as it stands so now I’m fingers crossed for the place to be clear by Friday so I can move next week – otherwise I’ll need to do some quick thinking. I contacted my usual van driver about the move but he no longer has a van so I’m already at the mercy of strangers which increases the effort involved.

This week I’ve got three meetings that will largely determine the timetable for the project over the next nine months, hopefully starting with an informal launch at Doncaster’s Culture Crawl on 23rd July.

1819 pair_four_blog

I organised some of the drawings in the gallery to pair the originals, made last summer, with the new ones made in the last month or two. Each original drawing, which has a collage element, – https://www.ian-latham.com/blog/gallery/paired-drawings-2018-2019/ – is copied to a small sketch and then taken to the upstairs studio and reinterpreted as a pure drawing. It’s interesting to put them together to see how closely they match or quite how far apart they’ve grown.

Wednesday had a meeting with Wayne Sables https://www.waynesablesproject.co.uk/ who is going to give feedback on aspects of production and presentation as well as, with my other collaborators, engaging in discussions about the installation as it progresses. This is what the ACE funding covers, paying for the time of experienced collaborators who can challenge the work as it progresses.

Studio Corner

I also stuck up some of the newer drawings to keep the place from seeming empty, even though I expect to be moving, and began a big version of one of them.

Drawings June 26th

Large Drawing in Progress

Friday ended up being a day of meetings and a visit to the new studio – which now won’t be the new studio. The building is being turned into apartments and all but two rooms are inaccessible.

I met with Mike Stubbs, https://www.mikestubbsart.com/ who is a collaborator/mentor for the installation and Iain Nicholls, https://iain-nicholls.com/ who is specifically helping out with the VR portion of the project.

The week leaves me with a lot of possibilities for the installation going forward – we discussed form, location, looking behind you, the way you are guided through space, the outward appearance of the space and much more. One of my major headaches is going to be holding a firm grip of what I want to achieve during the discussions I have.