The Geranium Project (R&D) 08

This week was supposed to be when I moved the VR into the space. Best laid plans and all that. I still need to sort out the internet for the studio and that’s delayed me for a week at the least. Life has intervened in other ways as well so part of the week was spent on the phone to Virgin Media.

I did get to the studio on Monday, continuing to work on the drawings I started last week,

Large Hydrangea August

Large Hydrangea August

adding some green to the big piece and working into the centre with black pastel and fingers.

One of six drawings made on Monday and Wednesday last week

One of six drawings made on Monday and Wednesday last week

As an example this is the development of the one I posted last week, another one looks like this now…

small hydrangea

small hydrangea

After this I got waylaid by virgin and decided to work on the VR at home for Wednesday and Thursday.

VR installation test

VR installation test

The first test I made works some of the drawings into a model of the installation space. The next two try to work the same drawings into the garden as a whole.

VR garden test

VR garden test

The latest has better materials but I’m still working out the problems with importing scale, establishing movement etc., should all be resolvable but I want to get it into the right ballpark before I bring the experts in.

2nd VR garden test

2nd VR garden test

this image and the next best illustrate the issue with scale

2nd VR garden test

2nd VR garden test

After 3 days away from the studio I continued to work on the large drawing, and did some further work on the small ones, but my major effort was to stretch some more paper on my new drawing boards.

large hydrangea

large hydrangea

small hydrangea

small hydrangea

And the studio looks like this.

Studio mid August

Studio mid August

The Geranium Project (R&D) 06

Monday was spent installing the curtain for Andrea’s installation and then positioning ‘Snow Line’ and hanging the companion drawing.

Monday Prep

Monday’s preparation

Andrea’s piece is a re-imagining of her recent MA exhibition about motherhood.

Andrea Berry - Installation

Andrea Berry – Installation

It has lighting and sound so this video gives a better impression.

On Tuesday we finished setting up the gallery downstairs when Luke and Kim brought their work from Barnsley. Adding a black curtain over the white for the downstairs installation and hanging seven of Kim’s large images. Luke placed his matrix of nine small prints at the foot of the stairs.

Composite Exhibition Image

Composite Exhibition Image

The evening really started for us at about 5:30 pm and we had a steady stream of visitors until I was able to lock up at 8:20 pm. Generally people were engaged and interested and we had up to fifteen people upstairs by 7:30 pm, so maybe between 80 and 100 visitors over the course of the night.

It makes it feel like the project is officially underway, even though that’s been the case for six weeks now.

The prosaic stuff. As this was part of the Doncaster Crawl, Doncopolitan contributed to the launch with posters and publicity as well as a good deal of coordination over the evening. The cost was limited to providing refreshments for our visitors so the evening cost me about £40.00 – It is useful to note that this cost is personal because no events were proposed in the project, it being R&D, but there will obviously be some costs associated with the planned review events in late September and December. Filling the holes from the last hang and painting added another £10.00 or thereabouts as I had white emulsion in and only needed to purchase filler. There is always a good amount of time spent prepping for a show and this used 22 hours of the 96 I’ve budgeted for physical assistance.  The shop makes a good venue and the exhibition will remain in place for a month or so.

The Geranium Project (R&D) 04

The week started with some work on the latest big drawing.

Big July Drawing

Still work to do, the greys need to go back a bit and the top right ‘v’ needs more definition, the balancing wedge on the left needs less definition. I think the bars in the bottom right need separating as well.

I did some work on some smaller drawings too, but not with any great sense of direction so they may well be used as collage very soon.

June/July Drawing

The big action this week though has been resolving the studio and investing in some kit. You are constantly weighing up future developments against current availability with VR kit. As I write HTC are a few months (or so) away from launching the Cosmos, which may or may not completely replace the Vive. There is no indication of cost yet. The alternatives are a Rift s, still a slight resolution issue according to reviews although that gap is narrowing and the Valve Index at £900.00

In the end, weighing everything up as far as I could, I went for the Vive and a PC powerful enough to run it.

After buying the kit I need I’ve then spent several hours installing before I can operate it properly. This has involved several hours reading forums and faqs about the issues I’ve faced as I installed and led me to thinking about the way the art can be dragged into being about the technology rather than the ideas. So time for a reality check and a list/timetable.

I’m aiming for a semi official launch at the Doncaster Crawl on the evening of July 23rd. After this, early August, I’m looking to bring the 3d modelled drawings into the virtual space and work on refining that aspect of the project. The first test run of a full public outing will be in September, preferably early, and then again in November/December after considering and reacting to the feedback at that event and from Iain, Wayne and Mike. Repeat this before an event in January/February to test the final(?) version and then prepare a report and spec the installation for proper display.

The big issue is turning the drawings into 3d and developing the (implied) narrative.

This blog covers two weeks as I’ve been away for a week.