Studio Build FOUR

Week Three in the Studio.

Worked on stabilising the big table for the 10” saw. Bought fishing line and tried a leaf to see hoe it worked in the space. I’ll need to stretch the line out so it hangs straighter.

Collaged elements onto the big drawing using PVA diluted 50/50 with water. The idea is that the bubbles will be split and torn when the glue is dry and text has been applied over the top.

Decided I needed the extra panel filling in and a small door added, I’ve made it 60” so you have to stoop to get inside.

Construction involved breaking down the easel I made as I needed the wood and I can’t stretch paper here until the weather is better. Once completed and fitted I painted the new panel and door.

The large drawing looks like this as a whole

Whole drawing flattened

Whole drawing flattened

Studio Build THREE

Week Two in the new studio.

Monday 12th November, built a step and a 80mm platform to allow me to work up high, stretched forty metres of nylon cord across the space just off centre, to the right of the entrance. Tightened some of the hardboard with extra screws.

Wednesday14th November, started the drawing in the big space, outline first and then charcoal.

The charcoal sections treated differently for each one.

Also put the heating on in the little office to dry out the stretched paper. The electricity usage went from 283 KWh to 299 KWh and the board was still not fully stretched after that. That’s £3.20 worth of heat, it was like a sauna in there. It means I won’t be doing any drawing on stretched paper here.

Friday I worked with blackboard paint and white emulsion to build up the interior. I also made a light fitting for the space as it gets dark early.

whole drawing expanded

whole drawing expanded

The whole drawing, as near as I can replicate it, looks like this. In progress, there is a long way to go, collage elements next.

This last video has the emulsion sections added with the light on. There is still a long way to go before I begin to add the interactive elements.

 

Studio Build TWO

Studio 071118

A full day at the studio. A full day means arriving at 11:00 and leaving at 15:50, I am retired after all.

First off I stretched the paper in the foreground, I’ll be interest to see how this dries given the lack of heating and fabulous ventilation. The time is an hour ahead on this photo, I couldn’t be arsed to change the time when the clocks went back. I moved on to constructing the panels for part one of the installation.

I cut all the wood first, twenty eight short lengths and then moved onto assembling the panels. I got the timing down to fifteen minutes a panel when my portable drill finally charged up. Before that I was putting the screws in by hand, each panel has eight 100mm bullets and fourteen 25mm bullets. The photographs illustrate the very simple production line approach.

An aside for today about the electricity. The supplier is e-on and their standard tariff is around 15.75 pence per KWh. The meter read 277 when I took possession and read 283 after today’s work. The advantage of having only one socket to power everything from.

The video is here so you can hear the noise the rain makes on the corrugated roof.

Friday 9th November. Arrive at 10:45 am with a view to completing as much of the structure as I can. Obviously someone has been in on Thursday as the lights come on when I enter the building. As it’s Axisweb’s rental I have to accept access by them and the landlord without prior notice. This could be either and maybe I won’t see the visitor I’m expecting today.

I made eight frames today to add to the six from Wednesday, each frame uses 4×2.4m C16 CLS 3×2 (48x75mm) at £3.10 each length and one sheet of whiteface hardboard at £7.75, so £20.16 per frame plus screws. Eight 100mm bullets costs about £1.70 and sixteen 25mm bullets are 23 pence. So £22.09 x 14 is £309.20 for the whole assembly. You could say £310.00 including the electricity.

I’ve got one spare frame to test the surfaces for the internal finish and I’m still toying with having a door. There are also a few spots that will need extra screws to lie flatter. You can also see how dark it is, 15:30 in November.

Here ends week one of the new studio!