The Geranium Project (R&D) 07

This week spent mostly working through the ramifications of paying people through the ACE funding. Actually quite easy to sort, and not too onerous a task when you’ve worked it out, but a real pain to find and understand the information through the HMRC website.

I decided I needed to get some greenery into the studio and this prompted a new set of drawings.

Hydrangea

I started a set of six drawings, this is one,

One of six drawings made on Monday and Wednesday

I also ordered some wood to make a large chest for storage – intentionally very heavy.

Large Chest

and started a big drawing…

Large Drawing begun Monday

I’ve worked further on this on Friday but the process is quite slow as the layers are added and I’m entirely unsure about the colours.

Progress on big drawing

This may well be torn up eventually. This week is a hiatus before the work on the VR component begins in earnest.

The Geranium Project (R&D) 06

Monday was spent installing the curtain for Andrea’s installation and then positioning ‘Snow Line’ and hanging the companion drawing.

Monday Prep

Monday’s preparation

Andrea’s piece is a re-imagining of her recent MA exhibition about motherhood.

Andrea Berry - Installation

Andrea Berry – Installation

It has lighting and sound so this video gives a better impression.

On Tuesday we finished setting up the gallery downstairs when Luke and Kim brought their work from Barnsley. Adding a black curtain over the white for the downstairs installation and hanging seven of Kim’s large images. Luke placed his matrix of nine small prints at the foot of the stairs.

Composite Exhibition Image

Composite Exhibition Image

The evening really started for us at about 5:30 pm and we had a steady stream of visitors until I was able to lock up at 8:20 pm. Generally people were engaged and interested and we had up to fifteen people upstairs by 7:30 pm, so maybe between 80 and 100 visitors over the course of the night.

It makes it feel like the project is officially underway, even though that’s been the case for six weeks now.

The prosaic stuff. As this was part of the Doncaster Crawl, Doncopolitan contributed to the launch with posters and publicity as well as a good deal of coordination over the evening. The cost was limited to providing refreshments for our visitors so the evening cost me about £40.00 – It is useful to note that this cost is personal because no events were proposed in the project, it being R&D, but there will obviously be some costs associated with the planned review events in late September and December. Filling the holes from the last hang and painting added another £10.00 or thereabouts as I had white emulsion in and only needed to purchase filler. There is always a good amount of time spent prepping for a show and this used 22 hours of the 96 I’ve budgeted for physical assistance.  The shop makes a good venue and the exhibition will remain in place for a month or so.

The Geranium Project (R&D) 03

Studio View

Studio view 24th June 2019 – tidied for meetings.

This weeks starting question – Is the urge to tidy up when faced with a blank mind a symptom of age? Is having a blank mind a symptom of age? Probably worth acknowledging at this juncture that my idea of tidy may not have a very wide currency.

I visited the new studio today but it’s a building site. I was told that they were stripping out inessential fittings, like the intranet wiring and some shelving, and I should be able to move in. I’d need a hard hat and breathing apparatus to be able to move in as it stands so now I’m fingers crossed for the place to be clear by Friday so I can move next week – otherwise I’ll need to do some quick thinking. I contacted my usual van driver about the move but he no longer has a van so I’m already at the mercy of strangers which increases the effort involved.

This week I’ve got three meetings that will largely determine the timetable for the project over the next nine months, hopefully starting with an informal launch at Doncaster’s Culture Crawl on 23rd July.

1819 pair_four_blog

I organised some of the drawings in the gallery to pair the originals, made last summer, with the new ones made in the last month or two. Each original drawing, which has a collage element, – https://www.ian-latham.com/blog/gallery/paired-drawings-2018-2019/ – is copied to a small sketch and then taken to the upstairs studio and reinterpreted as a pure drawing. It’s interesting to put them together to see how closely they match or quite how far apart they’ve grown.

Wednesday had a meeting with Wayne Sables https://www.waynesablesproject.co.uk/ who is going to give feedback on aspects of production and presentation as well as, with my other collaborators, engaging in discussions about the installation as it progresses. This is what the ACE funding covers, paying for the time of experienced collaborators who can challenge the work as it progresses.

Studio Corner

I also stuck up some of the newer drawings to keep the place from seeming empty, even though I expect to be moving, and began a big version of one of them.

Drawings June 26th

Large Drawing in Progress

Friday ended up being a day of meetings and a visit to the new studio – which now won’t be the new studio. The building is being turned into apartments and all but two rooms are inaccessible.

I met with Mike Stubbs, https://www.mikestubbsart.com/ who is a collaborator/mentor for the installation and Iain Nicholls, https://iain-nicholls.com/ who is specifically helping out with the VR portion of the project.

The week leaves me with a lot of possibilities for the installation going forward – we discussed form, location, looking behind you, the way you are guided through space, the outward appearance of the space and much more. One of my major headaches is going to be holding a firm grip of what I want to achieve during the discussions I have.