The Geranium Project (R&D) 08

This week was supposed to be when I moved the VR into the space. Best laid plans and all that. I still need to sort out the internet for the studio and that’s delayed me for a week at the least. Life has intervened in other ways as well so part of the week was spent on the phone to Virgin Media.

I did get to the studio on Monday, continuing to work on the drawings I started last week,

Large Hydrangea August

Large Hydrangea August

adding some green to the big piece and working into the centre with black pastel and fingers.

One of six drawings made on Monday and Wednesday last week

One of six drawings made on Monday and Wednesday last week

As an example this is the development of the one I posted last week, another one looks like this now…

small hydrangea

small hydrangea

After this I got waylaid by virgin and decided to work on the VR at home for Wednesday and Thursday.

VR installation test

VR installation test

The first test I made works some of the drawings into a model of the installation space. The next two try to work the same drawings into the garden as a whole.

VR garden test

VR garden test

The latest has better materials but I’m still working out the problems with importing scale, establishing movement etc., should all be resolvable but I want to get it into the right ballpark before I bring the experts in.

2nd VR garden test

2nd VR garden test

this image and the next best illustrate the issue with scale

2nd VR garden test

2nd VR garden test

After 3 days away from the studio I continued to work on the large drawing, and did some further work on the small ones, but my major effort was to stretch some more paper on my new drawing boards.

large hydrangea

large hydrangea

small hydrangea

small hydrangea

And the studio looks like this.

Studio mid August

Studio mid August

The Geranium Project (R&D) 05

Work on the big drawing on Monday 15th

Monday 15th was a return to the studio after a weeks holiday. The nature of a break is that it causes something of a reassessment and provides only thinking time, there is no time to make anything. I thought a lot about ways to create the drawings in 3D, whether doing this made the VR space an exhibition, if I was spending too much time worrying about that and I should merely make the world simply?

I tried out an idea for the space as a maquette.

Monday macquettes

Monday maquettes

On Wednesday I had a visit from another artist who is going to show in the space with me on Tuesday next for the Doncaster Crawl. The first publicised event for the installation project. A good portion of the day was spent discussing options.  I started an ‘inspiration’ corner to give any visitors an idea of what I was intending.

Inspiration board

Inspiration board

One board with some of my thinking and quotes from sources that have informed it – I need to work on some visuals for this.

Questions and Lookups board

Questions and Lookups board

On the whiteboard I put suggestions made by the ‘mentors’ and some questions raised by them and myself.

Afterwards I produced an addition to the maquettes.

Maquettes

Wednesday macquettes

Maybe the video gives a better idea of my thinking?

 

Friday was a day of tidying and organising for the ‘Crawl’. I cleared the gallery space,

Gallery space ready for Monday

Andrea Berry is showing some of her MA work and I’ll show the three ‘Snow Line’ works across the centre. Hopefully there will be some others in the space as well.  I’ll use the upstairs to show the beginnings of ‘Geranium’.

Studio space for Monday

Sketchbooks on one table

Sketchbooks

and drawings on the other

Portfolio of Drawings

It will all be ready for 5pm on Tuesday.

 

 

 

 

 

 

The Geranium Project (R&D) 01

Geranium Project

Geranium Project

Preparation:

Spent Saturday modelling a third drawing, subsequently loaded it and the previous two into a model of the garden and started rendering. It took twenty hours to render 12 seconds of video and I then discovered that somehow, I’m blaming the cat, the camera view had changed to perspective in the render window halfway through. 6 seconds of movement followed by 6 seconds standing on the spot watching the shadows move in the sun.

So I have a 12 second lead in to the garden, or a tenth of the 5000 frames, after 20 hrs of rendering. As things stand this means I’ll need to render for more than eight days if I could run the machine around the clock!

The initial render does give an idea of the feel I’m going for, a drawing realised in 3d, which you’ll be able to walk through and navigate out of towards other drawings from other gardens.

Today, Monday, in the studio I painted the boards with a coat of emulsion to be able to start the big drawing on Wednesday.

I spent my Sunday run thinking about how the space works as a garden, questioning whether the space needs to less abstract, or more abstract, how the ‘stories’ get told, what kind of navigation leads to the most interesting interpretations.

As this is the first ‘official’ geranium project post, this is the summary of the accepted submission, the what I’m doing for the next nine months statement.

‘Geranium’ is a room, approximately 5mtrs by 4mtrs, that depicts a garden as a drawing and by projection onto one wall. The audience can explore the drawn surfaces which include text and interactive elements, watch the filmed garden where shadows drift across the lawn suggesting people, and listen to the birdsong and poetry playing in the space. The interactivity works in two ways, some elements are to be touched and will speak to you, some will spring to life when viewed through your smart phone or tablet as AR birds or animals running across the space. It is designed for any audience.

There is a purple or pink flower with five petals, it has long palmately cleft leaves that are broadly circular. Drifts of these used to grow in my mother’s garden and in my own garden now, and I’ve always loved them. For a long time I’ve had a blind spot about the name, when I see the flowers I’m suddenly at a loss but when I can’t see them I can remember. It has reached the point where my wife refuses to tell me what they’re called. This is why the project is called geranium, after this lethologica (an inability to remember a particular word) I’ve suffered from for a number of years. I have wanted to create a space that tells a story since I completed my MA in 2005 and became fascinated with non linear narratives or stories that can be navigated by the audience. My intention is that encountering this space, listening to the poems and hearing snatches of the narrative offers one or two clues that can be explored through an online space or using virtual reality. I see the project as an opportunity to find out how to best present the idea to an audience and to use that initial audience to help refine the experience so that it becomes coherent and strong enough for exhibition.

Starting here!

Wednesday, after emptying buckets full of water from the now (hopefully) repaired leaking roof, was all about reassembling the installation. I decided it would be better to draw the interior with the guide of a projection of the virtual garden.

As a result there is very little to show. The installation needed some strengthening to stand up straight and I should build a stronger roof!

reassembled installation

reassembled installation

It took me all of Friday morning to put a roof on the installation so I could see the new video. I need to build a solid ceiling for the space.

I then spent the afternoon working on the new drawing for the walls. In the end grabbing the bull by the horns is the best way, or in this case grabbing the graphite powder with the rubber gloves (second coat). The piece is underway, but…

New Installation Drawing

New Installation Drawing

New Installation Drawing

New Installation Drawing

New Installation Drawing

New Installation Drawing

I then had an email exchange about moving to a new studio! I’m picking the keys up next week and will then need to dismantle the installation and pack up to move the week after.

The video, by the way, runs to 27 seconds now, 55 hours of rendering, and it needs doing again as I notice parts I have to change.