Studio Strike (four weeks to leave)

I’ve got three weeks to pack up and leave the studio and, as these things do, it’s come at a time when there are other things to do. I’m losing two days for the Future Now conference in York (C-19 permitting) and two days with Barnsley College to help out and begin the NHS maquettes. I’ve also got to find a new place and I’m still working on developing new ideas and refining the geranium VR. This obviously calls for a diary, even if only because it will keep me focused on the things I need to do.

So the first thing is to take the studio apart and pack everything while I look for more space. The shop now looks like this…

One Days Tidying

One Days Tidying – Monday 9th March

I think I can pack everything up by the middle of next week, I’m in York on Thursday and Friday. On Monday I sent some emails, took down the exhibition and the walls for the workshop downstairs, and added more sounds and animations to the VR for geranium.

geranium_march_2020_medium from Ian Latham on Vimeo.

Also this morning, Tuesday, I got the acknowledgement of my next funding application to ACE, so I will find out if I’m successful at the same time as I give the keys back to Axisweb.

Wednesday Tidying

Installation Dismantled – Wednesday 11th March

Wednesday I took down the installation and started to disassemble the panels. I also took the opportunity to film the installation without a roof.

The first chance to see it with decent light.

Friday I finished the panels and started to pile everything up downstairs ready to move. Another day should see it done.

Upstairs Tidying

Installation Fully dismantled – Friday 13th March

Downstairs Friday

Downstairs Tidying – Friday 13th March

The Geranium Project (R&D) 34

This last week has been spent planning next steps and finessing parts of the VR. The video run through is below.

I had a few visitors, only one set I didn’t invite directly, who were uniformly enthusiastic about the work. I had another today who took the number who have tried the VR to 50. People remain as enthusiastic about the installation as they do about the VR.

Next steps are to make the physical presence more robust so that it can be moved for exhibition and get the piece out to new locations. All of this is of course subject to funding. The final report can be seen here https://www.ian-latham.com/geranium.html

 

The Geranium Project (R&D) 31

Monday was spent making further adjustments to the VR world. One of the difficulties of working in VR on your own – the way I do it – is that you are continually moving into and out of the virtual as you make slight adjustments in Unity. It is hard to tell what effect they have had without taking the time to try out the world. On Monday I spent time doing this having been frustrated that I forgot to copy the bird_knot animations onto my portable disc so I couldn’t bring them into the model.

You get a sense of the small iterations I mean from the video above.

I’ve managed to work out the PIR for my arduino for the thunder inside the installation but part of working it out meant I discovered a collection of new parts I need to make the finished article. I tried to get the webcam working to cover this on Wednesday but there is a fault that means I can’t adjust the motion detection subtly enough to detect movement when I want it.

Friday was a chance to copy the current version of the VR before I attempt the build again and to shoot a view of the installation in its almost finished state.

I’ve also managed to set up a projection of the VR experience.

Projection from VR