New Studio – Week One

Got the opportunity to move into the shop I mentioned in my last post although the landlord has not yet provided the official OK. The agent says go ahead and move in and Axisweb left it to me to decide so I’m taking a chance, the most it might cost is my time and effort and the cost of one extra trip moving my equipment and materials.

So these are the first progress shots of the space, the shots I took when I first saw it last Friday, 24th January followed by shots taken after one day of clearing up. I’m counting this week and next together as week one, my gear is moving in on Wednesday 6th February so I should be rebuilding the environment by then.

Ground Floor, Shop, first viewing

Ground Floor, Shop, first viewing

This is the shop floor, off the street from about halfway down, I forgot to take it looking back.

Ground Floor after a day tidying

Ground Floor after a day tidying

This the same view after a day tidying, and below the view looking back the other way.

Ground Floor Towards window (day one)

Ground Floor Towards window (day one)

Still a lot of clearing up to do but the bulk of the big stuff that can be moved has been moved. This is the space I intend to use for exhibitions and projects for as long as I can.

Above this is the first floor that will be the studio and workshop.

First Floor first viewing

First Floor first viewing

First Floor (window) first viewing

First Floor (window) first viewing

The right hand side of the building, above the shop floor, and the window that faces this.

After shifting stuff this side now looks clearer.

First Floor after some tidying

First Floor after some tidying

First Floor window side after some tidying

First Floor window side after some tidying

The kitchen is on this floor too, on the left of the building as you look at it and actually above the shop next door.

First Floor Kitchen

First Floor Kitchen

This doesn’t look that much different to be fair but the ‘after’ picture gives a better idea of the layout.

First floor kitchen, 'after' picture

First floor kitchen, ‘after’ picture

There is another window, obviously, facing the kitchen.

First Floor (second window day one)

First Floor (second window day one)

I’ll probably keep the carpets down for some noise reduction but put plastic over them to make cleaning easier when I leave. The last occupants left a lot of stuff behind that I’ve had to clear up.

Above this floor there are two others that are essentially not usable due to decoration and wiring issues.

Second Floor

Second Floor

This is the second floor.

Third Floor

Third Floor

And the third, although the second floor now looks a bit different as It’s where all the stuff has gone.

Second Floor (storage)

Second Floor (storage)

So once the rest of the unwanted stuff is shifted up here I’ll seal the floors off as they were when the last occupants moved in.

Wednesday 6th February.

Moved out of the Unit in Wheatley and into the shop with all my stuff. It took half an hour to load the van and then a good hour to unload it. The morning was spent organising space and then the afternoon sorting the jigsaw puzzle of the installation, it now looks like this.

Ground Floor Wednesday

Ground Floor Wednesday

And the upstairs like this.

Friday 8th February:

Today spent reassembling the installation, lots of carrying things up stairs. The space just about accommodates the installation.

Installation First Floor towards Window

Installation First Floor towards Window

Installation First Floor from window

Installation First Floor from window

And here is a short walkthrough.

Studio Build TEN

Week Nine in the studio.

Effectively the last week.

I received the ceiling material for the installation so before I started to pack up I installed that and ran a quick test.

projector wall view

projector wall view

The change in lighting works, but it obviously takes some time for your eyes to adjust.

projector wall view

projector wall view

It does enough to give the sense of space from close up, and once the focus is correct the image is sharp enough. It is seen better in the video.

The video shows that my order for black muslin was delivered short by over a metre which is a bit of a bugger but I had enough to try it out. At the end of the video I deliberately step in front of the project lens to cast shadow, my intention is to add some texts that can only be read when in shadow, a different texture of white perhaps? The audio is still a test piece.

After this test I had to start dismantling the space, by the end of Monday I’d reached this state.

half environment

half environment

partly dismantled stuff

partly dismantled stuff

Then back on Wednesday to complete the breakdown.

The Unit is back in the state it was when I moved in and all I need now is to find another studio and move everything. I’ve got sixteen days to go but I’m seeing another space tomorrow.

Studio Build NINE

Week Eight in the Studio

A bit of a slow week so far. Found myself contemplating whether the entire process of creating is a progressive obscuring of cliché. The environment is on another cusp and after deliberating I’ve ordered the material for the ceiling – a fingers crossed moment.

Today I tidied and then painted the facing wall and the door wall, there is more to do on the garden wall but I need to see the projection to gauge how much I can do that will be visible.

3 small sculptures

Three small sculptures

have these three small sculptures now, and ideas for a larger one.

splashcover160119

splash cloth 160119

I was also quite taken by the pattern on my splash cloth.

The facing wall when you enter the space now looks like this…

facing wall 16/01/2019

facing wall 16/01/2019

and the wall with the door looks like this…

door wall 16/01/2019

door wall 16/01/2019

It feels as if they are much more coherent now. (16/01/19).

As I’m awaiting the material for the roof I decided to work on the larger sculpture I was planning. (18/01/2019).

View of large sculpture

View of large sculpture

View of large sculpture

View of large sculpture

View of large sculpture

View of large sculpture

I managed to build the frame and prime it on the day – I left at 3:00 pm as the primer needs to dry.

I also got word today that I have 21 days to quit the Unit. So from next week I’ll be packing up and sorting alternative accommodation through Axisweb, even if it’s only storage. I’ll hopefully be able to put the roof on and check the projector before I have to dismantle everything.

I thought I’d include this photograph of working detritus just to show the kind of mess I make, and a shot of the table returned to it’s normal status afterwards.

Equipment and materials during the build

Equipment and materials during the build

Evidence that I do, regardless of any comments, tidy up!

Evidence that I do, regardless of any comments, tidy up!