The Geranium Project (R&D) 10

After a week off and installing the computer and VR kit at the studio this week was back to it.

Kit in Studio

The kit has to be packed away securely each day, which takes about 30 minutes, as the studio is in a high burglary area.

So far I’ve got an animation working thanks to Luke, one of my assistants, and I resolved the teleporting issues I’d had while the kit was at home.

I keep thinking this doesn’t seem to amount to much for all the time I’ve had but then a visitor tries it out and I’m reassured that it appears to be impressive. There is an advantage in using an uncommon technology but there is also the problem that the work becomes about the technology or that the technology dominates the idea.

I’m simultaneously disappointed that I’m not further ahead and pleased with the progress I’ve made, not that that makes much sense.

 

The Geranium Project (R&D) 09

Another one of those nothing weeks with everything feeling like treading through mud.

An appointment on Monday meant I didn’t get in until Wednesday and spent the day sorting and checking the wifi. Then on Friday I did some drawing as I couldn’t get the kit moved.

The big drawing from last week looks like a disaster.

large_hydrangea_blog_1608

large_hydrangea_blog_1608

And may likely be used to feed some smaller drawings. I started another big drawing and a couple of smaller ones. The studio looks like this now.

firday_drawing_blog

Friday Studio

The big drawing was reasonably successful, better than the hydrangea, and the two small ones have begun reasonably.

Large Drawing

Large Drawing

I did a little bit of sketchbook work as well to explore bringing the big drawing into 3d.

Sketchbook

Sketchbook

I’ve got a ‘procedure’ at the Hospital at the beginning of next week and then I’m away at the end of the week so there will be no post for the end of August,next up in September when I should be back on track.

 

The Geranium Project (R&D) 08

This week was supposed to be when I moved the VR into the space. Best laid plans and all that. I still need to sort out the internet for the studio and that’s delayed me for a week at the least. Life has intervened in other ways as well so part of the week was spent on the phone to Virgin Media.

I did get to the studio on Monday, continuing to work on the drawings I started last week,

Large Hydrangea August

Large Hydrangea August

adding some green to the big piece and working into the centre with black pastel and fingers.

One of six drawings made on Monday and Wednesday last week

One of six drawings made on Monday and Wednesday last week

As an example this is the development of the one I posted last week, another one looks like this now…

small hydrangea

small hydrangea

After this I got waylaid by virgin and decided to work on the VR at home for Wednesday and Thursday.

VR installation test

VR installation test

The first test I made works some of the drawings into a model of the installation space. The next two try to work the same drawings into the garden as a whole.

VR garden test

VR garden test

The latest has better materials but I’m still working out the problems with importing scale, establishing movement etc., should all be resolvable but I want to get it into the right ballpark before I bring the experts in.

2nd VR garden test

2nd VR garden test

this image and the next best illustrate the issue with scale

2nd VR garden test

2nd VR garden test

After 3 days away from the studio I continued to work on the large drawing, and did some further work on the small ones, but my major effort was to stretch some more paper on my new drawing boards.

large hydrangea

large hydrangea

small hydrangea

small hydrangea

And the studio looks like this.

Studio mid August

Studio mid August